DAS CDP
Activity Timetable
ESTIMATES← Project Plan

Activity Timetable

Every activity with its owner split, T-shirt size, and derived low/high time range. Effort is in engineer-days (ed) — one engineer working one day. Generated from the backlog (specs/manifest.json), size bands (specs/estimate-bands.json), and owner role assignment — edit those, not this table.
ActivityOwner(s)SizePtsLowHigh
Loading…